What this session covers.
A 42-minute working session demonstrating how AI-powered evidence-based monitoring delivers measurable PMGSY programme outcomes — using UPRRDA Package 6152 as the live reference deployment.
Includes: full Vision AI demonstration on roller pass verification and cement spread uniformity, OMMAS-compatible reporting walkthrough, BOQ-linked progress tracking demonstration, and 15-minute Q&A with the deployment team.
- Live Vision AI demonstration — roller pass verification per chainage
- OMMAS reporting format walkthrough — KML, defect summaries, width profiles
- BOQ-linked progress tracking — verified events clearing BOQ lines automatically
- Q&A on deployment timeline, costs, and procurement compliance
UPRRDA Package 6152 case study.
The reference deployment delivered 95/100 quality rating, 4× operational transparency, and 40% rework cost reduction across a 9.23 km BC + CC road. Edge line continuity reached 98.4% across 18.18 km of marking verified. The deployment timeline from agreement to live monitoring was 7 days.
How to adopt this for your state RRDA.
The webinar closes with the implementation path for state RRDAs interested in adopting evidence-based monitoring for their PMGSY packages. Coverage includes procurement readiness (Make in India certified), DGMS compliance, OMMAS native integration, and the 7-day deployment standard.